PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at the 1st floor Sally ports Facing West.jpg Curtain Wall mullions at the 3rd floor South Elevation.jpg Duct work raisers at the 2nd floor Facing North.jpg Installed VAV boxes at the 1st floor Facing West.jpg Installing Stair -1 Facing South.jpg Installing waste and vent piping at the 2nd floor bathrooms 1.jpg Installing waste and vent piping at the 2nd floor bathrooms 2.jpg Copper piping-duct work at the 4th floor Facing East.jpg
Previous pageNext page Installing Stair -1 Facing South
Installing Stair -1 Facing South